Our appliances arrived on the 23Rd. This is our refrigerator, washer, and dryer.



This past week Frank's cousin Clair Mast came to help us. I was put on K.P. Duty and Clean-up detail. Some of their work was done on solid footing.



Other was higher off the ground. Watch our Lookout go up!




They even put the collar tie up on top!



They also worked on roof joists.
So, now, the house looks like this.
















And when it is tarped, like this. The two lower tarps (unseen in this picture) slope down from the center of the house to the doors on either side, carrying the water out the doors. They worked quite well over the weekend.




But while the house gets taller, our supply piles get smaller!


We are again waiting for fair weather. The next things will be more internal before Operation Roof takes place.